|
CONSTRUCTIONAL CABLE LYING SYSTEM Preparing a project and installation according to
the rules defined by international standardization
associations
EIA/TIA (568, TSB36/40)
ISO/IEC (DIS1 1801/IS1 1801)
EN (50173)
Category 5e-6/7 UTP copper cable laying
Multi-mode – single-mode fiber cable laying
Test with special equipment, reporting and 15
year product performance warranty
Communication Infrastructure
Frame Relay Line Assignment
Accurate solutions for the assignment of physical
lines for the access to the frame relay network
through Turpak and Ttnet network, tracking the
imaginary circuit applications, increasing the speed.
ISDN-PRI
We are right next to you to supply the required
equipment for your digital telephone switchboards,
for backup of your data lines or for assignment
of ISDN-PRI required for conference and to their
connections.
|
|
Phone Numbers Starting With 444
Telephones having numbers that start with 444 can be called at a
price of a local call from all over Turkey.
For the retail companies
which would like to have stronger contact with their clients or
companies having many employees working out of the office,
the numbers starting with 444 can offer big advantages. Bemaş,
gives consulting service for the ideal network installation for the
numbers starting with 444.
Leased Line Hat Assignment
Assignment of end to end physical lines for the access to leasedline
network through DXX, TDM and PCM systems, tracking
the required definitions and speed increments according to the
requirements of the applications.
TDM Node Installations
At the points where Turkish Telecom infrastructure is inadequate,
some small investments may help you reach to the result faster.
Bemaş gives consulting services for defininf which investments
should be done at which points and for commissioning of these
investments.
Solving The Line Problems and Operating
Operating and maintenance enclose the actions for troubleshooting
of the problems that may occur after the installation. Moreover,
some lines may not be working at the expected performance after
the installation. For these situations the sources of performance
loss should be investigated and the mandatory processes should be
committed for the solution. |